Last edited by Gardazshura
Tuesday, August 4, 2020 | History

2 edition of Final environmental impact statement and proposed forest plan amendments found in the catalog.

Final environmental impact statement and proposed forest plan amendments

Final environmental impact statement and proposed forest plan amendments

Flagtail Fire Recovery Project.

  • 396 Want to read
  • 33 Currently reading

Published by U.S. Dept. of Agriculture, Forest Service in [John Day, OR] .
Written in English

    Places:
  • Malheur National Forest (Or.),
  • Oregon,
  • Malheur National Forest.,
  • Malheur National Forest
    • Subjects:
    • Forest fires -- Environmental aspects -- Oregon -- Malheur National Forest.,
    • Forest fires -- Oregon -- Malheur National Forest -- Prevention and control.,
    • Forest management -- Oregon -- Malheur National Forest.,
    • Forest conservation -- Oregon -- Malheur National Forest.,
    • Malheur National Forest (Or.)

    • Edition Notes

      Other titlesFlagtail Fire Recovery Project
      ContributionsUnited States. Forest Service.
      Classifications
      LC ClassificationsSD428.M3 F556 2004
      The Physical Object
      Pagination2 v. :
      ID Numbers
      Open LibraryOL3350371M
      LC Control Number2004368586
      OCLC/WorldCa54807848

      Home» EIS Final Environmental Impact Statement This Environmental Impact Statement analyzes the alternate ways for disposing of decommissioned, defieled reactor compliments from U.S. Navy nuclear-powered cruisers, (Bainbridge, Truxtun, Long Beach, California Class and Virginia Class) and Los Angeles Class, and Ohio Class submarines. Richfield Field Office proposed resource management plan and final environmental impact statement. This PRMP/FEIS revises and consolidates these land use plans and subsequent amendments: Forest management framework plan (MFP) (), Mountain Valley MFP (), Henry Mountain MFP (), Parker Mountain MFP (), Cedar-Beaver-Garfield.

      Posted April 3, The Forest Service has granted an extension for submitting comments on the proposed Forest Plan Amendment. The new deadline is Monday, April 15th at midnight. Several important documents and reports that are incorporated by reference in to the Draft Environmental Assessment had not been made available to the public until recently after requests were made. Double-crested cormorant management plan to reduce predation of juvenile salmonids in the Columbia River Estuary: Final environmental impact statement: Organizational author: United States. Army. Corps of Engineers. Portland District United States. National Marine Fisheries Service: Report type: Environmental impact statement: Publisher.

      Final environmental impact statement for the proposed Cotterel wind power project and proposed resource management plan amendment by United States. The narrative in the Record of Decision (ROD) for the Sierra Nevada Forest Plan Amendment Project Environmental Impact Statement summarizes management standards and guidelines for national forests in the Sierra Nevada and Modoc Plateau. Appendix A of the ROD presents the final land allocations and standards and guidelines for the decision.


Share this book
You might also like
Ronald Duncan

Ronald Duncan

Proceedings

Proceedings

oly Spirit & preaching

oly Spirit & preaching

A Satyr against the French

A Satyr against the French

Review of the criminal and civil justice system in Western Australia

Review of the criminal and civil justice system in Western Australia

Modern and late Quaternary depositional environment of the St. Anna Trough area, northern Kara Sea

Modern and late Quaternary depositional environment of the St. Anna Trough area, northern Kara Sea

Reunion

Reunion

Thinking about crime

Thinking about crime

Gunmans bluff

Gunmans bluff

National income and living standards

National income and living standards

Daniel Boone

Daniel Boone

Fermilab, May-June 1992 DOE Tiger Team assessment

Fermilab, May-June 1992 DOE Tiger Team assessment

Final environmental impact statement and proposed forest plan amendments Download PDF EPUB FB2

Book/Printed Material Final environmental impact statement: Monument Fire recovery project and proposed non significant forest plan amendments: Prairie City Ranger District, Malheur National Forest, Grant and Baker counties, Oregon.

Monument Fire recovery project and proposed non significant forest plan amendments. Proposed Spokane Resource Management Plan. Amendment Final Environmental Impact.

Statement () Final (X) Department of the Interior Bureau of Land Management. Type of Action: Administrative (X) Legislative () Abstract: This Proposed Resource Management Plan Amendment EIS discusses fluid mineral leasing on Federal Mineral Estate in Eastern.

In accordance with the National Environmental Policy Act ofas amended, (NEPA) and the Federal Land Policy and Management Act ofas amended, (FLPMA) the Bureau of Land Management (BLM) has prepared the Wyoming Proposed Resource Management Final environmental impact statement and proposed forest plan amendments book (RMP) Amendment and Final Environmental Impact Statement (EIS) for Greater Sage-Grouse.

Start Preamble Start Printed Page AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement (FERC Ruby Pipeline Project) and request for comments on the proposed forest plan amendments for the Fremont Land and Resource Management Plan to be included in the Ruby Project.

Sierra Nevada forest plan amendment: final supplemental environmental impact statement. Other Title final supplemental environmental impact statement Contributor Names United States. Forest Service. Pacific Southwest Region.

Glossary Final EIS and Proposed LUPAs for the Energy Gateway South Transmission Project Glossary-5 Conductor – The wire cable strung between transmission line towers through which the electrical current flows. Conformance – A proposed action must be provided for specifically in a land use plan or, if not specifically mentioned, must be clearly consistent with the terms, conditions, and.

The Bay Delta Conservation Plan/California WaterFix Final Environmental Impact Report/Environmental Impact Statement (Final EIR/EIS) was posted online Decem On DecemThe U.S.

Bureau of Reclamation (Reclamation), in coordination with the California Department of Water Resources (DWR), issued a Notice of Availability (see.

USDA Forest Service NFS Appeals Staff 14th and Independence, SW P.O Box Washington, DC To whom it may concern, Enclosed please find an appeal of the Record of Decision and Final Environmental Impact Statement on Amendments to Eleven Southwestern National Forest Plans.

The appeal is filed pursuant to Forest Service NEPA appeal. The interdisciplinary team shall develop a forest plan and environmental impact statement using the process established in Sec. and paragraph (b) below. (b) Public review of plan and environmental impact statement. A draft and final environmental impact statement shall be prepared for the proposed plan according to NEPA procedures.

Notice of Availability – Final Environmental Impact Statement (FEIS) On November 9,the City re-issued the FEIS for the proposed PSE Liquefied Natural Gas facility in the Tacoma Tideflats. A comment letter was omitted from the FEIS and has now been included; changes have been made to Section Earth and to Section 4 Comments/Responses.

ADDENDUM TO JUNE FSEIS DEVELOPMENT REGULATIONS - AMENDMENTS September 8, 1 INTRODUCTION In Junea Final Supplemental Environmental Impact Statement (Final SEIS) was released which, in conjunction with the April Draft SEIS, addressed the probable significant adverse impacts of adoption of the Development Regulations.

Final Environmental Impact Statement Superior National Forest v Scoping The Notice of Intent (NOI) was published in the. Federal Register. on Decem A scoping package was sent to interested individuals, agencies, Tribes, affiliations, organizations and federal, state and local government agencies on File Size: 7MB.

Land Management Plan Amendment Environmental Impact Statement 2 Adaptive management is the foundation for planning and management. The planning regulations require that forest plans be revised every years after forest plan approval (36 CFR (g)).

Forest plans need to be dynamic to account for changed resource conditions, suchFile Size: KB. State forest land management plan: final environmental impact statement. Montana. Department of Natural Resources and Conservation Type.

Book Material. Published material. Publication info [Helena, Mont.]:Dept. of Natural Resources and Conservation, Notes: " " Draft EIS prepared by the Dept. of State Lands.

Subject: Review of the Draft Environmental Impact Statement (DEIS) for WAPA, Rice Solar Energy Project, Proposed megawatt Solar Energy Generating Facility, a kV/kV Electrical Transmission Tie-Line and a kV/kV Electrical. Interconnection Switchyard, Riverside County, CA. Dear Ms. Reilly. Forest Plan The applies to the George Washington National Forest for a total of approximately 1, acres.

This Final Environmental Impact Statement (FEIS) describes the analysis of several alternatives for revising the Forest Plan for the George Washington National Forest and discloses the environmental effects of these alternatives.

FINAL Environmental Impact Statement - Chippewa and Superior National Forests Documents are format. The software to view these documents is available free from Adobe, and can be downloaded at The document has been separated into sections for quicker download time.

The proposed project would result in an estimated 1, acres of new disturbance ( acres on Tonto National Forest land and acres on private land owned by Pinto Valley Mining Corp.).

The EIS will evaluate and disclose the potential environmental effects from approval of the Mining Plan of Operations for activities on the Tonto National. Notice of Availability of the Rocky Mountain Region Greater Sage-Grouse Proposed Land Use Plan Amendments and Final Environmental Impact Statements for the Wyoming, Northwest Colorado, Lewistown, and North Dakota Sub-Regions ( ).

Final environmental impact statement and proposed plan amendment for the Powder River Basin oil and gas project [microform]: (WY) / U.S. Department of the Interior, Bureau of Land Management, Wyoming State Office and Buffalo Field Office. The Sierra, Sequoia and Inyo forest plan revisions will be completed through the development of one environmental impact statement.

The final EIS will result in three separate Records of Decision and three separate forest plans. Forest Supervisors will remain the responsible officials for making decisions on their specific forest plans.The Commercial Low-Level Radioactive Waste Disposal Site Environmental Impact Statement (EIS), Volume I, provides three levels of detail to the reader.

The Executive Summary, Chapter One, provides a summary of the proposed actions, potential impacts, and a description of the preferred alternatives.Full text of "Proposed White Sands resource management plan amendment/final environmental impact statement for McGregor Range" See other formats.